Hadleigh Park Pump Track
A Project By: Bidston Surveys
The project
Hadleigh Park in Benfleet, Essex, holds a unique place in British cycling history. It hosted the mountain bike events at the London 2012 Olympic Games, and its legacy trails continue to draw riders of every level from across the country.
OnTrack, specialists in the design and construction of bike tracks, appointed Bidston Surveys to carry out two 3D topographical surveys within the park. OnTrack needed accurate existing-ground data to redesign the area and build a new pump track that sits naturally within the built environment and the Olympic landscape.
The challenge
A pump track relies on precisely shaped rollers and berms, so the design team needed to understand every change in level across the existing ground. Small errors can mean extra earthworks, poor drainage or a track that does not ride as intended. Also the more precise measurements the better as these will affect the contours of the land on the drawings.
Both survey areas combined tarmac ramps, gravel and unmade tracks, grass banks, natural paths and dense vegetation. This is demanding terrain to measure, with steep banks and gentle falls side by side. The park also stayed open to the public throughout, so the team had to work safely around riders and walkers.
Our approach
- Survey control. Control stations were installed at each area using MAG nails and retro targets, giving a stable framework for all survey work.
- National grid and datum. Both surveys were referenced to Ordnance Survey (OSGB36) using the OSTN15 transformation, with levels to Ordnance Datum Newlyn via the OSGM15 geoid model. OnTrack can therefore place their design in its true real-world position.
- Laser scanning. We captured dense 3D point cloud data across both sites, recording the full shape of the area and surroundings in fine detail.
- Total station detail. A conventional survey picked up every surface change and ramp edge. In areas of longer grass, where a scanner reads the top of the vegetation, total station observations with detail poles and prisms gave true ground levels.
- One combined model. Levels on hard standing were taken from the scan data and combined with the total station observations on the same survey grid. Together they produced a high-accuracy digital terrain model and close-interval contours, so the shape of the ground can be read at a glance.
- Drawings and CAD. A Topographical site plan for each pump track area was issued at 1:100 on A1 PDF, with grid coordinates shown, alongside 2D and 3D CAD files for the design team all aligned to the Ordnance Survey (OSGB36). We Issued XML, DWG, PDF AND N4CE file formats to suit any type of design, earthworks and even machine control being undertaken for the new tracks.
The results
OnTrack received two accurate, highly detailed 3D Topographical surveys tied to the national grid, ready to drop straight into their design software.
- Design confidence: the new pump track could be shaped around the true existing levels
- Reduced earthworks risk: cut and fill could be planned from real data, not estimates
- Better drainage planning: falls across the banks and paths are clearly recorded
- Ready for setting out: the same control can be used to set out the new track on site
It was a privilege to play a part in the next chapter of an Olympic venue within the built environment, helping a new generation of riders enjoy Hadleigh Park.
Building partnerships
Working with specialist designers and contractors like OnTrack across the built environment is central to how we operate. We are constantly looking to extend our partnerships with engineers, architects, designers and contractors across the UK and Europe. Whether you are planning a leisure facility, a new build or a major infrastructure scheme within the built environment, we would welcome the chance to work together.