Retaining Buildings To Reinvigorate Their Lifespan

St John’s Well Lane, Berkhampsted By: T2S Architecture This was T2S’ first formal engagement and represents another successful collaboration with the developer Klara Homes. T2S inherited a planning consent achieved by another architect, involving the demolition, refurbishment, and extension of an existing building to create 4 high quality residential dwellings. We were tasked with making some improvements and refinements to the planning consent to improve the architectural quality of the scheme – and then deliver this on-site. Works were completed in early 2023. This project is a great expression of T2S’ core values. We are passionate about retaining buildings to reinvigorate their lifespan – both from a historic/conservation and sustainability perspective. There is a logic in making buildings more efficient as they generally already benefit from the existing urban amenities. In this instance, the site is within close proximity to Berkhamsted town centre for shopping and other leisure activities. The railway station is a brief 5/10-minute walk, offering access to London in approximately 30/45 minutes. Developments of this nature share our urban values – which align well with the principles set out in the 15-minute city text. This can promote more local live / work balance and promote sustainable means … Continue reading Retaining Buildings To Reinvigorate Their Lifespan